First-Of-Its-Kind Electric Truck Charging Facility At Port Of Long Beach: A Case Study

Presented by:

  • Salim Youssefzadeh, CEO, WattEV

Session Banner

Dec 6, 2023, 12:30 pm EST

What It Takes To Bring Charging Infrastructure Online and Planning for the Future.

The WattEV Port of Long Beach charging depot is the first-of-its-kind charging facility focused exclusively on electric heavy-duty trucks. The site is currently operating under its first phase with the ability to charge 26 trucks concurrently with 5 MW of capacity delivered by Southern California Edison.

The full phase of the site will include an additional 7 MW of power serving additional CCS stalls along with MCS pass-through lanes.

Join this session where we will walk through all stages of the site from start to finish to explain what it takes to get a heavy-duty truck charging depot online and how to plan for the future.






All Sessions: December 2023 Infrastructure Conference

Free to attend December 4-6, 2023: view the daily webinar schedule here. This virtual event will span all things EV charging in two main tracks:

Track 1: Deploying EV Infrastructure & Fleets
Content for fleet/facility managers, charging network operators, public transport planners, etc.

Track 2: Design & Manufacturing of Charging Systems
Content for engineers who are building, testing, and manufacturing charging systems.

All live webcast sessions are free to attend and will be recorded and available to watch on-demand after the event. Register for a session below and reserve your spot to watch it live or on-demand.

 

If you like our Virtual Conferences,
you’ll love our Magazine and Newsletters!

Sign up now, you can unsubscribe at any time: